integral
Working closely with various organizations involved in managing public infrastructures, Consultik Ltd has developed and marketed an integrated software package called integral 98. This software is based on a global management model that was developed for and integrated into many major public works organizations
English
Supported Technologies
Windows 95/98/ME,
Windows XP/2000/NT
Click on a technology to view similar products within this category.
Pricing
Users (# of seats), Server
25000 to 250000
pelletierc@consultik.com
(418)873-5200
Additional Product Information
With our integrated software package, you can:; build an inventory; record deficiencies, along with severity and density; record periodic detailed inspections; record inspection information (inspector, date, location); enter maintenance standards and requirements; record completed maintenance and rehabilitation activities (maintenance log); provide various reports on maintenance needs and completed activities ; track effectiveness of various pavement and bridge maintenance techniques; provide summary reporting or tracking system to address corrective actions and repair schedule ; collect data, information and deficiencies during field inspections; link to GPS and other data collection systems; group deficiencies by asset and attribute (material, covering, etc.); create needs from surveyed deficiencies ; create more than one need from a deficiency/severity/density combination; create the same need for different limits of severity and density ; generate needs from values related to more than one asset; set a time frame for each need generated from deficiencies (start/end date, lead time); plan inspections on a regular base (frequency) with defined time periods (start/end date, lead time); inspect on a daily matter; plan day-to-day maintenance work orders arising from inspection results with defined time periods (start/end date, # days lead time); record relevant weather conditions (end of snow storm) allowing determination of lead time; obtain brief outline of rehabilitation needs (pavement rehabilitation); consider assets other than road section in preparation of capital assets plan; keep track of specific time when the need was identified and action taken; keep track of incoming calls; record accident information; record client feedback